Battlefield Road/Route 65 Interchange Reconstruction Project Update April 20
April 17, 2015 08:53 AM
Battlefield Road/Route 65 Interchange Reconstruction Project
Update for Week of April 20, 2015
-
Northbound right-lane closed on Route 65 between Battlefield Road and Sunshine Street
-
Crews focus on completing south half of Battlefield Road bridge over Route 65
Work Scheduled:
-
Removing existing shoulder and grading dirt for new northbound Route 65 auxiliary lane between Battlefield Road and Route 65
-
Preparing south half of Battlefield Road bridge for new concrete driving surface
-
Installing storm drains along Battlefield Road on either side of Route 65
-
Building retaining wall on southwest corner of Battlefield Road and Route 65
Traffic Impacts:
-
Northbound right-lane of Route 65 closed between Battlefield Road and Sunshine Street during lower traffic volume times.
-
Route 65 speed limit reduced to 50 mph during lane closings
-
Route 65 traffic shifted AWAY from median at Battlefield Road
-
TRAFFIC CONGESTIONon Battlefield Road at Route 65. One lane open in each direction in diverging diamond traffic pattern
-
Crews and equipment entering and leaving work areas
(Weather or construction delays could alter the work schedule.)
Project Summary:
-
Replace Battlefield Road bridge over Route 65 one-half at a time
-
Convert interchange to a Diverging Diamond configuration
-
Build northbound and southbound auxiliary lanes on Route 65 to connect Sunshine Street and Battlefield Road ramps
-
Install new traffic signal at Battlefield Road and Woodstock Avenue
Project information with live camera view
Prime Contractor: Hartman and Company, Inc., Springfield
Completion Date: September 2015
Total Project Cost: $12.5 million.
Partnership Project: City of Springfield, Greene County, Ozarks Transportation Organization, Jack Henry & Associates, Justice Jewelers and McLean Enterprises, Inc.